Reconstruction of Vinnytsia Airport aerodrome

LLC "EDBK" as a subcontractor performs work on the reconstruction of the aerodrome of the airport "Vinnytsia". The project envisages the expansion of the existing runway and its strengthening. In addition, work will be carried out on the reconstruction of the platform and taxiway.

Work began in September 2021. The first stage envisages the reconstruction of the runway, within which the defective slabs of the existing airfield surface will be replaced, the existing reinforced concrete surface will be milled. Reinforcement of the existing pavement involves the installation of a leveling layer of reinforced layer of lean concrete and a layer of pavement of cement concrete with a thickness of 38 cm.

As of the end of 2021, the airport has completed the replacement of defective slabs of the existing aerodrome pavement, sealing the joints between the slabs of the existing pavement, milled the existing reinforced concrete pavement, arranged a leveling layer of reinforced layer of lean concrete. In addition, work was carried out on the installation of drainage collectors, edge drainage was arranged.

Project Gallery

More photos